Ready Mix Concrete ( R.M.C.) Plant
The Following are the Quantity Of Materials Required for the Concrete Works Of Different Types
1) P.C.C. With Graded Stone Chips :
For 10 cu.m. Of Plane Cement Concrete Work with Graded Stone ChipsFor M10 Grade :-
Cement @ 1.54 cu.m or 45 Bags
Sand @ 4.62 cu.m or 133 Bags
Stone Chips @ 9.24 cu.m. or 266 Bags.
For M15 Grade :-
Cement @ 2.2 cu.m or 65 Bags
Sand @ 4.4 cu.m or 127 Bags
Stone Chips @ 8.8 cu.m. or 254 Bags.
For M20 Grade :-
Cement @ 2.8 cu.m or 81 Bags
Sand @ 4.2 cu.m or 121 Bags
Stone Chips @ 8.4 cu.m. or 242 Bags.
For M25 Grade :-
Cement @ 3.85 cu.m or 111 Bags
Sand @ 3.85 cu.m or 111 Bags
Stone Chips @ 7.7 cu.m. or 222 Bags.
2) P.C.C. With Brick Ballast or Brick Chips :
For 10 cu.m. Of Plane Cement Concrete Work with Brick BallastFor M5 Grade :-
Cement @ 1.00 cu.m or 29 Bags
Sand @ 5.00 cu.m or 144 Bags
Brick Ballast @ 10.00 cu.m. or 288 Bags.
For M7.5 Grade :-
Cement @ 1.18 cu.m or 34 Bags
Sand @ 4.74 cu.m or 137 Bags
Brick Ballast @ 9.48 cu.m. or 273 Bags.
For M10 Grade :-
Cement @ 1.23 cu.m or 36 Bags
Sand @ 4.92 cu.m or 142 Bags
Brick Ballast @ 9.85 cu.m. or 284 Bags.
For M15 Grade :-
Cement @ 2.29 cu.m or 66 Bags
Sand @ 4.57 cu.m or 132 Bags
Brick Ballast @ 9.14 cu.m. or 264 Bags.
3) R.C.C. With Graded Stone Chips :
For 10 cu.m. Of Reinforced Cement Concrete Work with Graded Stone Chips, The Amount Of Cement, Sand, Stone Chips Required are same as that of the P.C.C.Quantity Of Steel Required :-
For Normal Slab, Chajja, Lintel = 785kg or 0.785 Ton
For Roof Slab = 1180kg or 1.18 Ton
For Stair = 1570kg or 1.57 Ton
For Column and Beams = 1960kg or 1.96 Ton
Quantity Of Binding ( Black Annealed Wire) Wire Required :-
For Normal Slab, Chajja, Lintel = 0.785kg
For Roof Slab = 1.18kg
For Stair = 1.57kg
For Column and Beams = 1.96kg